Manufacturing and installation

A fire door holds back fire only as well as it was installed. The certificate covers the design; on site, the fire resistance rating depends on the anchors, the joint filling and 2–4 mm gaps. That is why we manufacture, install and take responsibility for every opening ourselves — from factory inspection to the signed handover certificate.

Manufacturing

01

To our shop drawings

Products are manufactured to approved sketches and shop drawings (KMD) at partner production sites under contract manufacturing agreements — under DPS technical control.

02

Quality control

Incoming inspection of materials and hardware, checks on frame and leaf geometry, finish quality and completeness. Every product comes with a product data sheet.

03

Marking by opening

Each product carries the opening reference, floor and work zone from the specification. Batches are shipped in installation sequence.

Why installation is everything

THE COST OF A MISTAKE

Expanding foam instead of fire-rated filling — and an EI 60 door is no longer a fire door

Wrong anchors, a racked frame, uneven gaps, the wrong hardware — each of these mistakes strips the door of its tested fire resistance rating. The Russian Emergencies Ministry (EMERCOM) inspector will see it at acceptance, and a fire will find it in the first few minutes. That is why our installation is carried out only by in-house crews, following the manufacturer's method and the product data sheet.

Gaps and wall junction

Door set gaps and the frame-to-wall junction1234FRONT VIEWwall5678910PLAN DETAIL1head gap 2–4 mm2hinge-side gap 2–4 mm3lock-side gap 2–4 mm4under leaf — per data sheet5steel frame6anchor fixing per data sheet7fire-rated joint filling8intumescent strip9rebate seal10leaf
Leaf-to-frame gaps — an even 2–4 mm around the entire perimeter, so the seals and intumescent strip close the rebate in a fire. The undercut and threshold type follow the product data sheet; for EIS smoke-tight doors — an automatic drop seal or a fixed threshold.

How installation works

  1. Accepting the work front

    We check opening readiness against the survey schedule: geometry, finished floor levels, no voids. Accepted by signed certificate.

  2. Setting out

    With a laser level we set out the vertical, horizontal and finished floor level. All doors on a floor sit in one plane and at one height.

  3. Frame installation

    The frame is set on installation wedges: plumb, level, diagonals, wall plane. We check the reveal angle.

  4. Fixing

    Anchors — type, length and spacing as per the product data sheet and wall material. The frame does not distort when tightened.

  5. Filling the installation joint

    Only with materials specified in the data sheet and certificate: fire-resistant compounds, mineral wool inserts. We issue a concealed works certificate with photos.

  6. Hanging the leaf

    Hinges, anti-lift dog bolts, seals. The leaf is hung by two fitters — no racking, no damage.

  7. Hardware and adjustment

    Locks, door closers, door selectors, panic hardware, electromechanical devices. We adjust gaps, closing speed and closing force.

  8. Inspection and handover

    The site foreman inspects the opening against a checklist and hands it over to the client by signed certificate, with as-built documentation.

Plane tolerances

A door set “by eye” closes properly for a month. A door set to tolerance does so for its entire service life. We work to the recommended GOST installation requirements and the product data sheet — whichever is stricter.

Frame installation tolerances: plumb, level, diagonals, twistvertical≤ 1.5 mm per 1 m, ≤ 3 mm over heightdiagonalsdifference — to manufacturer's tolerancetop viewframe twisttotal ≤ 3 mmRecommended GOST 31173 requirements for installed steel door sets
ItemToleranceBasis
Steel door frame — plumb and levelmax. 1.5 mm per 1 m, but max. 3 mm over the product heightGOST 31173, recommended installation requirements
Frame twisttotal deviation from normal max. 3 mmGOST 31173
Door set in the openingmax. 4 mm over the full heightGOST R 71972-2025
Straightness of leaf and frame edgesmax. 1.5 mm per 1 mGOST R 71972-2025
Leaf flatnessup to 4 mm per 1 m — metal; up to 6 mm per 1 m — MDF and facingsGOST R 71972-2025
Gap under the overlap1.5–3 mm depending on leaf sizeGOST 31173
Large-format systems and partitionsas per shop drawings (KMD) and system data sheet; plumb checked on every mullionKMD, GOST 23747, system data sheet
Fixingonly anchors and plugs as per the data sheet; foam, adhesive and nails are prohibited as fixingsGOST 31173

Measurement methods follow GOST R 58939-2020: laser level, spirit level, plumb line, straightedge, feeler gauges. Values for each specific system are recorded in the shop drawings (KMD) and data sheet and entered in the certificate.

Acoustic doors

Sound passes through any gap. So on acoustic doors, in addition to fire-rated filling of the installation joint, we seal the entire frame perimeter with silicone on both sides — otherwise a 42 dB door performs like a 30 dB one.

Sealing an acoustic door: fixed threshold and automatic drop seal1silicone under threshold2seal in threshold3silicone around the frameFixed threshold1no silicone under the leaf2drop seal lowers3silicone around the frameAutomatic drop sealInstallation joint — fire-rated filling per data sheet; silicone closes acoustic bridges around the perimeter
With a fixed threshold, silicone is also applied under the threshold. With an automatic drop seal it is not: a drop-down seal works under the leaf, and the floor at the opening must be level so it makes contact across the full width.

Adjustment and commissioning

  • Hinges

    Adjustment for height, width and compression; an even 2–4 mm gap around the perimeter, the leaf does not rub or sag.

  • Locks and latches

    We set the strike plate: the latch engages effortlessly, the bolt enters freely, the key and cylinder turn smoothly.

  • Door closers

    Size selected for leaf width and weight; closing and latching speed, back-check. The door closes from any position and latches without slamming.

  • Door selectors

    Double doors close in the correct sequence — inactive leaf first, without jamming.

  • Panic hardware

    The bar opens the door in one movement, without sticking; we check travel and return.

  • Automatic drop seals

    Travel and actuation point: the seal touches the floor across the full width and does not catch when opening.

  • Electromechanical devices

    Electric locks, hold-open devices and sensors — tested with the access control system and fire alarm: on a “Fire” signal the doors release and close.

  • Fixings check

    Re-tightening of anchors and screws on hinges, hardware and closers. Repeat check at project handover.

What the foreman checks

ParameterRequirementHow we check
Frame plumbwithin the product data sheet tolerancelaser, digital level
Frame diagonalsdifference within the manufacturer's tolerancelaser distance meter, tape measure
Rebate gaps2–4 mm, even around the perimeterfeeler gauges, gap gauges
Undercutas per data sheet; for EIS — threshold operationfeeler gauges, visual check across full width
Closingfrom any position, to full latching, without slammingcloser and selector check
Seals and stripcontinuous, unbroken, unpaintedperimeter inspection
Fixingsall anchors installed and tightenedtorque wrench
Installation jointfilled as per data sheet, no voidsinspection, concealed works certificate
Hardwarepanic hardware, locks, electromechanical devices workingfunctional test
Appearanceno chips, scratches or installation marksinspection, photo record

Tools

Laser level
Level and protractor
Rotary hammer
Cordless drill
Feeler gauges
Torque wrench
Vacuum lifters
Distance meter and tape

Every crew is equipped identically: laser plane level, digital levels, professional cordless tools, feeler gauges, torque wrenches, vacuum lifters for leaves and glass. Plus a construction vacuum cleaner: after installation the opening is left clean.

The team on site

Structure of the on-site installation teamProject managerschedule, work front, documentationSite supervisorquality, adjustment, acceptanceCrew 12–3 installersCrew 22–3 installersCrew 32–3 installersCrew N2–3 installersNumber of crews to suit the project scope and schedule; work zones run in parallel
One responsible foreman per project or work zone. Crews work in parallel; the number of crews is matched to the scope and the general contractor's schedule.
01

Installers

In-house DPS specialists experienced in installing fire-rated, acoustic and glazed systems. All are certified riggers.

02

Foreman

Responsible for quality: setting planes, adjusting gaps and hardware, concealed works certificates, handover of every opening.

03

Project manager

Manages the schedule, the work front and liaison with the general contractor; compiles the as-built documentation.

What an installer must know

An installer of fire-rated and acoustic doors is not just a “door fitter”. It is a specialist at the intersection of construction, fire safety, mechanics and low-voltage systems. We employ only people who master all of these disciplines.

  • Reading drawings

    Shop drawings (KMD), sketches, specifications and door schedules, manufacturer's installation diagrams.

  • Setting out and measuring

    Laser levels, optical levels, digital levels and protractors, distance meters.

  • Substrates and fixings

    Concrete, brick, aerated concrete, plasterboard — anchor selection, embedment depth, opening reinforcement.

  • Fire safety

    EI, EIW and EIS classes; what may and may not be changed in a tested assembly.

  • Fire-resistant materials

    Installation joint fillers, intumescent strips, fire-rated sealants.

  • Acoustics

    Perimeter sealing, thresholds, seals — how not to lose the rated decibels.

  • Hardware

    Locks, door closers, door selectors, panic hardware, automatic drop seals — installation and adjustment.

  • Electromechanical devices

    Electric locks, hold-open devices, sensors; basic work with low-voltage connections.

  • Glass

    Glazed leaves and partitions: vacuum lifters, glass installation and fixing.

  • Rigging

    Slinging, moving and lifting heavy and large-format assemblies.

  • Health and safety

    Work at height, electrical safety, PPE, work permits.

  • Documentation

    Photo records, concealed works certificates, acceptance checklists for every opening.

Training and certification

  1. Mentored on-the-job training

    A new installer works alongside an experienced foreman on live projects.

  2. Product training

    Installation methods from the manufacturers of the systems and hardware — for every system we install.

  3. Permits and certificates

    Occupational safety, work at height, electrical safety, rigging — before going on site.

  4. Sign-off by the foreman

    Independent installation only after the foreman has checked the quality of several openings.

Permits and safety

  • Health and safety

    Occupational safety training and testing, induction and task-specific briefings on site.

  • Work at height

    Work-at-height permits and training, access equipment with inspection certificates.

  • Electrical safety

    Electrical safety qualification for power tool use; tools in good, tested condition.

  • Riggers

    Every installer holds a rigger's certificate — the load is handled by the same crew that installs it.

  • PPE

    Hard hats, safety footwear, cut-resistant gloves, safety glasses, high-visibility vests — for everyone on site.

  • Medical checks

    Periodic medical examinations, with clearance for work based on the results.

Handover documents

  • Concealed works inspection certificates — fixing and installation joint filling, with photos
  • Acceptance certificates for installed openings by specification reference
  • Product data sheets, certificates of conformity, test reports
  • Hardware adjustment and closing test records
  • As-built opening layout drawings
  • Operating instructions and warranty terms

Regulatory framework

GOST R 59642-2021Opening infills in fire barriers. General requirements for installation, maintenance and repair
GOST R 57327-2016Steel fire doors. General technical requirements and test methods
GOST 31173-2016Steel door blocks. Specifications
GOST R 71972-2025Requirements for door set installation: deviation from plumb, straightness and flatness (in force from 01.09.2025)
GOST R 58939-2020Methods of measuring deviations of geometric parameters in construction
GOST 23747-2015Aluminium profile door blocks. Specifications
GOST 475-2016Wooden and composite door blocks. General specifications
Federal Law No. 123-FZTechnical Regulations on Fire Safety Requirements
SP 1.13130.2020Escape routes and exits — requirements for doors on escape routes
Government Decree No. 1479Fire Safety Regulations — proper self-closing and seals on fire doors

What's included

  • Manufacturing to approved shop drawings (KMD)
  • Quality control and marking of products by opening
  • Delivery in batches to schedule
  • Installation of door sets and glazed systems
  • Adjustment and commissioning of closers, panic hardware and electromechanical devices
  • Concealed works certificates for fixing and the installation joint
  • Handover of openings by signed certificate with as-built documentation

Result

Installed and adjusted openings that keep their tested fire resistance rating and pass inspection first time — with a complete document set.

What we need from the client

  • Openings prepared according to the deviation schedule
  • Storage area and power supply on site
  • Work front available to schedule

Timing and cost depend on the scope of work and are calculated for each project.

Let's discuss your project

Send us your documentation or door schedule — we will reply with a scope of works and costing.